Bhutan’s active UNFCCC NDC 3.0 remains explicitly provisional. It reaffirms carbon neutrality and lists potential measures across energy, industry, agriculture/livestock, forests and waste; implementation is stated to depend on international support and updated sector strategies.
dzongkhags
20
gewogs
205
Project pathways
07
01 / CHOOSE YOUR CONTEXT
Where could your idea take root?
Start with a place you know. Each opportunity remains open for local assessment.
Administrative reference: 2020-10-26 · 205 gewogs. Later boundary changes may be absent.
The map loads as you approach it.
YOUR LOCAL CONTEXT
Explore Bhutan, one place at a time.
Select an area on the map or use the search. Open its local facts, administrative context and next field checks.
Designate a national authority for the Paris Agreement Crediting MechanismDepartment of Environment and Climate Change, Ministry of Energy and Natural Resource
✓
Publish host participation requirementsSubmitted on 22 September 2024
✓
Sign a bilateral agreement with a buying country (Article 6.2)1 with Singapore
4
Set up a cooperative approach and authorise it (letter of authorization)Not yet, according to the pipeline
5
Transfer the first authorised units (ITMOs)Not yet, according to the pipeline
CARBON PROJECT TRACKER & INTERACTIVE DESIGN STUDIO · BTN
Explore carbon project records, and design what is possible next in Bhutan.
Inspect every voluntary carbon market project listed in Bhutan, check methodologies and credit issuances, and build an actionable pipeline of potential carbon projects ready to design in your workspace.
Listed carbon projects
3
Across Verra, Gold Standard, ACR, CAR, ART, Isometric
Total Credits Issued
0
Registry-reported tCO₂e
Total Credits Retired
0
Permanent retirements
Potential Projects Pipeline
4 projects
100,022 tCO₂e/yr · $1,965,390/yr est.
Loading registered carbon projects for Bhutan…
Registry data: Berkeley Carbon Trading Project Voluntary Registry Offsets Database (CC BY 4.0), covering ACR, ART TREES, CAR, Gold Standard, Isometric, and Verra (VCS). Potential project figures are indicative screening estimates for early project design; credit issuance requires site-specific baseline measurements, PDD validation by an accredited VVB/DOE, and registry verification.
03 / FIND A PRACTICAL START
What would you like to work on?
Chhimung · Interpretive opportunity
Spring and watershed resilience workspace
Map water sources and catchments, document seasonal conditions and organize community management and nature-based recharge options.
NDC Section 3, Adaptation component, printed pp. 6–8, identifies drying springs and watershed/spring-source management priorities. Site choice and intervention require local validation.
People to involve
Department of Environment and Climate Change · Water agencies · Dzongkhag and gewog administrations · Community water users and researchers
First checks
Confirm source/catchment boundaries, water-use rights and existing water plans.
Review seasonal water availability, competing uses and responsible maintenance institutions.
What the map can tell you
Locate the proposed study within the 2020-10-26 administrative reference. Compare broad 2021 land-cover classes before a site visit. These layers do not identify the activity, present conditions, rights, hazards or suitability; confirm those with local records and field evidence.
Check on the ground
Spring coordinates and seasonal flow observations
Water quality and user registers
Catchment land-use observations
Maintenance and community-management records
Review your idea after sign-in. An eight-step guide helps you turn it into a private feasibility draft.
No project type is named, but these are the closest. You will pick the project type, and Chhimung still pre-fills the form.
COUNTRY WORKSPACE
Continue with your next step
Carry the national context for Bhutan into public funding, project and research records.
Selected region: Chhimung, Bhutan. Public results below are national; they are not filtered to this district or region.
Before you start
Do I need a complete project?
No. Start with an activity and a place. You can mark any answer unknown; the guide turns that gap into a practical task.
Does a map selection establish suitability?
No. Use the map to frame local questions. Check the site, rights, participants, technology and evidence with the relevant people.
Can Nemo help with my idea?
Your private project guide works without an AI provider. After sign-in, choose Discuss with Nemo for a question about your project when the service is available.
Sources & context
Country research sources
Explore the original documents and source tables. These references do not establish complete country coverage and do not add values to the map.
Pack 2026-10-29.1. Policy priorities and proposed opportunities are separate from evidence for your project.
Kingdom of Bhutan: Third Nationally Determined Contribution (Provisional)
Royal Government of Bhutan · Third NDC, provisional; dated/submitted 2025-11-10
Third NDC period 2026–2035
Royal Government of Bhutan. Kingdom of Bhutan: Third Nationally Determined Contribution (Provisional). Third NDC, provisional; dated/submitted 2025-11-10.
Reference link only. No source document or figure is redistributed. Explanations are original paraphrases.
UN OCHA / Humanitarian Data Exchange · Source reference valid 2020-10-26; retrieved 2026-10-29
Source reference 2020-10-26; source dataset dates [2020-10-26T00:00:00 TO 2025-10-30T23:59:59]. Administrative changes after that reference may be absent.
Boundaries: OCHA ROAP. Published by UN OCHA / HDX COD-AB. CC BY-IGO 3.0. Generalized by nemoearth; source P-codes retained. No endorsement implied.
Creative Commons Attribution for Intergovernmental Organisations (CC BY-IGO 3.0); https://creativecommons.org/licenses/by/3.0/igo/