nemoearth
CLIMATE ACTIONClimate action · intelligence · opportunity
Cape Coast Castle above the shoreline in Cape Coast, Ghana
THE COUNTRY ATLAS / GHEXPLORE · UNDERSTAND · BEGIN

A PLACE TO START · Ghana

Ghana.

Explore opportunities

COUNTRY OVERVIEW

Climate priorities in Ghana

Ghana's updated 2021 contribution provides the policy starting point through 2030. It combines resilience, landscape restoration, sustainable energy, responsible production, and social inclusion, with some programme actions conditional on external support. The ideas below are screening interpretations, not confirmed projects.

regions
16
districts
260
Project pathways
06

01 / CHOOSE YOUR CONTEXT

Where could your idea take root?

Start with a place you know. Each opportunity remains open for local assessment.

Administrative reference: 2021-03-08 · 260 districts. Later boundary changes may be absent.

The map loads as you approach it.

YOUR LOCAL CONTEXT

Explore Ghana, one place at a time.

Select an area on the map or use the search. Open its local facts, administrative context and next field checks.

Browse all regions and districts

PEOPLE & THE LIVING LANDSCAPE

Understand the numbers.
See what changes.

A national picture of Ghana. Select a measure, explore the years and follow the original sources.

National observations
Census on file · 202130,792,608

People counted in this census.

Read census source

Population through time

Annual population estimates. The census is a separate count.

35,064,2722025 · people
Population in Ghana, 1990 to 2025National source observations. Gaps in the line mean missing years. Use the year slider to read exact values.018.93M37.87M1990200820251990: 15,394,648 people1991: 15,787,496 people1992: 16,184,855 people1993: 16,589,519 people1994: 16,993,190 people1995: 17,399,017 people1996: 17,810,181 people1997: 18,238,958 people1998: 18,688,036 people1999: 19,149,864 people2000: 19,637,087 people2001: 20,167,069 people2002: 20,729,388 people2003: 21,296,705 people2004: 21,868,298 people2005: 22,449,438 people2006: 23,040,702 people2007: 23,642,279 people2008: 24,249,946 people2009: 24,862,664 people2010: 25,474,995 people2011: 26,095,088 people2012: 26,734,268 people2013: 27,386,193 people2014: 28,041,592 people2015: 28,696,068 people2016: 29,356,742 people2017: 30,008,354 people2018: 30,637,585 people2019: 31,258,945 people2020: 31,887,809 people2021: 32,518,665 people2022: 33,149,152 people2023: 33,787,914 people2024: 34,427,414 people2025: 35,064,272 people

NATIONAL CLIMATE SNAPSHOT

Country outlook

National emissions, stated ambition, registry activity and finance needs for Ghana.

STATED NDC TARGET

Conditional NDC and unconditional NDC

Ghana commits to implementing 34 mitigation measures (9 unconditional, 25 conditional) to achieve an absolute reduction in emissions of 64 MtCO2e compared to 2020-2030 cumulative emissions by 2030.

Measured progress unavailable · compatible baseline series needed.

Source: Updated first NDC · 4 Nov 2021

CARBON CREDITS REPORTED

15.63MIssued
10.41MRetired
  • Issued15.63M
  • Retired10.41M

Cumulative tCO₂e totals · 73 listed projects.

CARBON PROJECT LANDSCAPE

  • Cookstoves36
  • Afforestation/Reforestation16
  • Clean Water9
  • Sustainable Agriculture3
  • Other activity types9

Leading activity types · listed project count

NDC FINANCE NEEDS · USD BN

ConditionalUnconditional
  • Total5.36 / 3.9

Published needs · conditional / unconditional. These amounts are not committed funding.

UNFCCC NDC records ↗Berkeley registry database · Aug 2026 ↗

Exact registry totals: 15,628,755 credits issued and 10,413,290 credits retired.

CARBON MARKET COOPERATION

Article 6 readiness

5 / 5 milestones reported
Host-approved activities
2
Registered activities
2
Article 6.4 credits
0
Article 6.2 activities
44
Process, agreements & activity
  1. Designate a national authority for the Paris Agreement Crediting MechanismEnvironmental Protection Agency
  2. Publish host participation requirementsSubmitted on 08 October 2024
  3. Sign a bilateral agreement with a buying country (Article 6.2)5 with Sweden, Singapore, Republic of Korea, Liechtenstein, Switzerland
  4. Set up a cooperative approach and authorise it (letter of authorization)1 cooperative approach(es)
  5. Transfer the first authorised units (ITMOs)11,733 tCO₂e

BILATERAL AGREEMENTS

  • Implementation Agreement: Ghana → SwedenSource ↗
  • Implementation Agreement: Ghana → SingaporeSource ↗
  • Other: Ghana → Republic of KoreaSource ↗
  • Other: Ghana → LiechtensteinSource ↗
  • Implementation Agreement: Ghana → Switzerland · CA0002Source ↗

COOPERATIVE APPROACHES

  • Promotion of climate smart agriculture practices for sustainable rice cultivation in Ghana5,946,108 tCO₂e authorised · 11,733 tCO₂e transferred · AFOLU, Buildings, Waste

UNEP-CCC Article 6 Pipeline ↗Updated 13 October 2026

CARBON PROJECT TRACKER & INTERACTIVE DESIGN STUDIO · GHA

Explore carbon project records, and design what is possible next in Ghana.

Inspect every voluntary carbon market project listed in Ghana, check methodologies and credit issuances, and build an actionable pipeline of potential carbon projects ready to design in your workspace.

Listed carbon projects
73
19 with recorded issuance
Total Credits Issued
15,628,755
Registry-reported tCO₂e
Total Credits Retired
10,413,290
67% retirement ratio
Potential Projects Pipeline
4 projects
100,022 tCO₂e/yr · $1,965,390/yr est.

Loading registered carbon projects for Ghana…

Registry data: Berkeley Carbon Trading Project Voluntary Registry Offsets Database (CC BY 4.0), covering ACR, ART TREES, CAR, Gold Standard, Isometric, and Verra (VCS). Potential project figures are indicative screening estimates for early project design; credit issuance requires site-specific baseline measurements, PDD validation by an accredited VVB/DOE, and registry verification.

03 / FIND A PRACTICAL START

What would you like to work on?

Opportunity categories

Nkwanta South Municipal · Interpretive opportunity

Community forest management and landscape restoration

Screen a locally supported forest or landscape activity where degradation, resource pressures, and practical restoration or management actions are documented.

Editorial interpretation: this may be a relevant screening route because the NDC explicitly names gender-responsive sustainable forest management and describes forest conservation and landscape restoration. Source: NDC physical PDF pp. 15–16, adaptation mitigation co-benefits; pp. 26–27, contribution table.

People to involve

Forestry Commission and relevant district assemblies · Traditional authorities and community resource institutions · Farmers and current forest users · Women's and youth groups

First checks

  • Verify land and tree tenure, forest status, concessions, current management plans, and applicable rights.
  • Check whether restoration or carbon-related programmes already cover the area and clarify local resource-use restrictions.
  • Confirm community consent, gender-responsive participation, and benefit-sharing expectations.
What the map can tell you

Locate the proposed study within the 2021-03-08 administrative reference. Compare broad 2021 land-cover classes before a site visit. These layers do not identify the activity, present conditions, rights, hazards or suitability; confirm those with local records and field evidence.

Check on the ground

  • Forest condition and land-use baseline with dated geospatial records
  • Plot and boundary observations
  • Evidence on fire, harvesting, and other resource uses
  • Stakeholder map, documented decisions, and monitoring and grievance arrangements

Review your idea after sign-in. An eight-step guide helps you turn it into a private feasibility draft.

COUNTRY WORKSPACE

Continue with your next step

Carry the national context for Ghana into public funding, project and research records.

Selected region: Nkwanta South Municipal, Ghana. Public results below are national; they are not filtered to this district or region.

Before you start

Do I need a complete project?

No. Start with an activity and a place. You can mark any answer unknown; the guide turns that gap into a practical task.

Does a map selection establish suitability?

No. Use the map to frame local questions. Check the site, rights, participants, technology and evidence with the relevant people.

Can Nemo help with my idea?

Your private project guide works without an AI provider. After sign-in, choose Discuss with Nemo for a question about your project when the service is available.

Sources & context

Country research sources

Explore the original documents and source tables. These references do not establish complete country coverage and do not add values to the map.

Pack 2026-10-29.1. Policy priorities and proposed opportunities are separate from evidence for your project.

Ghana: Updated Nationally Determined Contribution under the Paris Agreement (2020–2030)

Environmental Protection Agency and Ministry of Environment, Science, Technology and Innovation, Ghana · Updated first NDC, submitted 2021

2020–2030

Environmental Protection Agency and Ministry of Environment, Science, Technology and Innovation, Ghana. Ghana: Updated Nationally Determined Contribution under the Paris Agreement (2020–2030). Updated first NDC, submitted 2021.

Reference link only. No source document or figure is redistributed. Explanations are original paraphrases.

Open original source ↗
Ghana administrative reference — OCHA COD-AB derivative

UN OCHA / Humanitarian Data Exchange · Source reference valid 2021-03-08; retrieved 2026-10-29

Source reference 2021-03-08; source dataset dates [2021-03-08T00:00:00 TO 2025-10-30T23:59:59]. Administrative changes after that reference may be absent.

Boundaries: Ghana Statistical Services (GSS). Published by UN OCHA / HDX COD-AB. CC BY-IGO 3.0. Generalized by nemoearth; source P-codes retained. No endorsement implied.

Creative Commons Attribution for Intergovernmental Organisations (CC BY-IGO 3.0); https://creativecommons.org/licenses/by/3.0/igo/

Open original source ↗
ESA WorldCover 2021 v200 — generalized land-cover context

ESA WorldCover consortium · 2021 v200

2021 observations; categorical context, not present site conditions.

© ESA WorldCover project 2021 / Contains modified Copernicus Sentinel data (2021) processed by ESA WorldCover consortium. Zanaga et al. (2022), https://doi.org/10.5281/zenodo.7254221. Generalized by nemoearth to approximately 0.9 km and masked to the cited OCHA administrative outline.

Creative Commons Attribution 4.0 International (CC BY 4.0); https://creativecommons.org/licenses/by/4.0/

Open original source ↗

Ask Nemo

Explore an opportunity, understand a method or plan your next project step with Nemo.

Open Nemo in your workspace Your conversations stay in your private workspace. Sign in if prompted.