nemoearth
CLIMATE ACTIONClimate action · intelligence · opportunity
Mount Kinabalu viewed from the south near Kundasang, Sabah
THE COUNTRY ATLAS / MYEXPLORE · UNDERSTAND · BEGIN

A PLACE TO START · Malaysia

Malaysia.

Explore opportunities

COUNTRY OVERVIEW

Climate priorities in Malaysia

Malaysia’s NDC 3.0 is an economy-wide absolute emissions target with sector coverage including energy, IPPU, waste, agriculture and LULUCF. Its policy narrative highlights energy transition, transport, methane measures and forest protection; the higher ambition level is conditional on international support.

states and federal territories
16
districts
160
Project pathways
07

01 / CHOOSE YOUR CONTEXT

Where could your idea take root?

Start with a place you know. Each opportunity remains open for local assessment.

DOSM administrative reference map; 16 states and 160 districts; boundary reference year unspecified.

The map loads as you approach it.

YOUR LOCAL CONTEXT

Explore Malaysia, one place at a time.

Select an area on the map or use the search. Open its local facts, administrative context and next field checks.

Browse all states and federal territories and districts

PEOPLE & THE LIVING LANDSCAPE

Understand the numbers.
See what changes.

A national picture of Malaysia. Select a measure, explore the years and follow the original sources.

National observations
Census on file · 202032,447,385

People counted in this census.

Read census source

Population through time

Annual population estimates. The census is a separate count.

35,977,8382025 · people
Population in Malaysia, 1990 to 2025National source observations. Gaps in the line mean missing years. Use the year slider to read exact values.019.43M38.86M1990200820251990: 17,833,171 people1991: 18,342,464 people1992: 18,834,572 people1993: 19,322,664 people1994: 19,820,446 people1995: 20,330,599 people1996: 20,850,087 people1997: 21,375,218 people1998: 21,906,713 people1999: 22,435,531 people2000: 22,967,816 people2001: 23,526,538 people2002: 24,102,477 people2003: 24,679,602 people2004: 25,256,772 people2005: 25,836,071 people2006: 26,417,909 people2007: 26,998,389 people2008: 27,570,059 people2009: 28,124,778 people2010: 28,655,776 people2011: 29,162,039 people2012: 29,662,831 people2013: 30,174,265 people2014: 30,696,137 people2015: 31,232,798 people2016: 31,789,685 people2017: 32,355,644 people2018: 32,910,967 people2019: 33,440,596 people2020: 33,889,558 people2021: 34,282,399 people2022: 34,695,493 people2023: 35,126,298 people2024: 35,557,673 people2025: 35,977,838 people

NATIONAL CLIMATE SNAPSHOT

Country outlook

National emissions, stated ambition, registry activity and finance needs for Malaysia.

STATED NDC TARGET

Conditional NDC and unconditional NDC

Malaysia commits to an absolute reduction of 15–30 million tonnes of CO₂ equivalent (MtCO₂eq) by 2035 from the peak level.

Measured progress unavailable · compatible baseline series needed.

Source: Third NDC · 24 Oct 2025

CARBON CREDITS REPORTED

7.62MIssued
5.81MRetired
  • Issued7.62M
  • Retired5.81M

Cumulative tCO₂e totals · 35 listed projects.

CARBON PROJECT LANDSCAPE

  • Methane Recovery in Wastewater9
  • Biomass8
  • Improved Forest Management4
  • Hydropower2
  • Other activity types12

Leading activity types · listed project count

UNFCCC NDC records ↗Berkeley registry database · Aug 2026 ↗

Exact registry totals: 7,615,444 credits issued and 5,812,182 credits retired.

CARBON MARKET COOPERATION

Article 6 readiness

3 / 5 milestones reported
Host-approved activities
4
Registered activities
0
Article 6.4 credits
0
Article 6.2 activities
0
Process, agreements & activity
  1. Designate a national authority for the Paris Agreement Crediting MechanismMinistry of Natural Resource and Environmental Sustainability
  2. Publish host participation requirementsSubmitted on 29 October 2025
  3. Sign a bilateral agreement with a buying country (Article 6.2)2 with Singapore, Republic of Korea
  4. Set up a cooperative approach and authorise it (letter of authorization)Not yet, according to the pipeline
  5. Transfer the first authorised units (ITMOs)Not yet, according to the pipeline

BILATERAL AGREEMENTS

  • MoU: Malaysia → SingaporeSource ↗
  • MoU: Malaysia → Republic of KoreaSource ↗

UNEP-CCC Article 6 Pipeline ↗Updated 13 October 2026

CARBON PROJECT TRACKER & INTERACTIVE DESIGN STUDIO · MYS

Explore carbon project records, and design what is possible next in Malaysia.

Inspect every voluntary carbon market project listed in Malaysia, check methodologies and credit issuances, and build an actionable pipeline of potential carbon projects ready to design in your workspace.

Listed carbon projects
35
7 with recorded issuance
Total Credits Issued
7,615,444
Registry-reported tCO₂e
Total Credits Retired
5,812,182
76% retirement ratio
Potential Projects Pipeline
4 projects
100,022 tCO₂e/yr · $1,965,390/yr est.

Loading registered carbon projects for Malaysia…

Registry data: Berkeley Carbon Trading Project Voluntary Registry Offsets Database (CC BY 4.0), covering ACR, ART TREES, CAR, Gold Standard, Isometric, and Verra (VCS). Potential project figures are indicative screening estimates for early project design; credit issuance requires site-specific baseline measurements, PDD validation by an accredited VVB/DOE, and registry verification.

03 / FIND A PRACTICAL START

What would you like to work on?

Opportunity categories

Jelebu · Interpretive opportunity

Industrial wastewater methane assessment

Establish process and treatment baselines for a willing facility, then screen operational improvement and monitoring needs.

NDC narrative, printed pp. 6–7, describes efforts to scale methane capture from industrial wastewater. It does not specify candidate facilities or establish project-level eligibility.

People to involve

Industrial facility operator · NRES · State environmental agencies · Wastewater specialists and industry bodies

First checks

  • Identify stream sources, treatment system, operator and data access.
  • Review existing treatment duties, planned upgrades and community/environmental safeguards.
What the map can tell you

Locate the proposed study within the DOSM administrative reference with an unspecified boundary year. Compare broad 2021 land-cover classes before a site visit. These layers do not identify the activity, present conditions, rights, hazards or suitability; confirm those with local records and field evidence.

Check on the ground

  • Flow and wastewater quality samples
  • Treatment operating and maintenance logs
  • Metered energy and process records
  • Discharge and worker interview records

Review your idea after sign-in. An eight-step guide helps you turn it into a private feasibility draft.

COUNTRY WORKSPACE

Continue with your next step

Carry the national context for Malaysia into public funding, project and research records.

Selected region: Jelebu, Malaysia. Public results below are national; they are not filtered to this district or region.

Before you start

Do I need a complete project?

No. Start with an activity and a place. You can mark any answer unknown; the guide turns that gap into a practical task.

Does a map selection establish suitability?

No. Use the map to frame local questions. Check the site, rights, participants, technology and evidence with the relevant people.

Can Nemo help with my idea?

Your private project guide works without an AI provider. After sign-in, choose Discuss with Nemo for a question about your project when the service is available.

Sources & context

Country research sources

Explore the original documents and source tables. These references do not establish complete country coverage and do not add values to the map.

Pack 2026-10-29.1. Policy priorities and proposed opportunities are separate from evidence for your project.

Malaysia’s Third Iteration of the Nationally Determined Contribution

Malaysia; led by Ministry of Natural Resources and Environmental Sustainability (NRES) · NDC 3.0, 2025; UNFCCC submission 2025-10-24

2026-01-01 to 2035-12-31

Malaysia; led by Ministry of Natural Resources and Environmental Sustainability (NRES). Malaysia’s Third Iteration of the Nationally Determined Contribution. NDC 3.0, 2025; UNFCCC submission 2025-10-24.

Reference link only. No source document or figure is redistributed. Explanations are original paraphrases.

Open original source ↗
Malaysia administrative reference map — DOSM open data

Department of Statistics Malaysia · Boundary reference year unspecified; retrieved 2026-10-31

16 states and 160 districts. Boundary reference year is unspecified.

Department of Statistics Malaysia, data-open administrative_1_state.geojson and administrative_2_district.geojson. State parent geometry is dissolved from district geometry by DOSM state code. No boundary reference year is stated. No official endorsement is implied.

DOSM Open Data License; commercial and non-commercial use, adaptation, publication, and distribution permitted; https://raw.githubusercontent.com/dosm-malaysia/data-open/main/LICENSE.md

Open original source ↗
ESA WorldCover 2021 v200 — generalized land-cover context

ESA WorldCover consortium · 2021 v200

2021 observations; categorical context, not present site conditions.

© ESA WorldCover project 2021 / Contains modified Copernicus Sentinel data (2021) processed by ESA WorldCover consortium. Zanaga et al. (2022), https://doi.org/10.5281/zenodo.7254221. Generalized by nemoearth to approximately 0.9 km and masked to the cited OCHA administrative outline.

Creative Commons Attribution 4.0 International (CC BY 4.0); https://creativecommons.org/licenses/by/4.0/

Open original source ↗

Ask Nemo

Explore an opportunity, understand a method or plan your next project step with Nemo.

Open Nemo in your workspace Your conversations stay in your private workspace. Sign in if prompted.