Sri Lanka’s NDC 3.0 covers six mitigation sectors and nine adaptation sectors, with a dedicated loss-and-damage chapter. It describes conditional and unconditional components and explicitly reports local authority gaps in data, monitoring, technical capacity and budgets.
provinces
09
districts
25
Project pathways
07
01 / CHOOSE YOUR CONTEXT
Where could your idea take root?
Start with a place you know. Each opportunity remains open for local assessment.
Administrative reference: 2022-08-16 · 25 districts. Later boundary changes may be absent.
The map loads as you approach it.
YOUR LOCAL CONTEXT
Explore Sri Lanka, one place at a time.
Select an area on the map or use the search. Open its local facts, administrative context and next field checks.
National emissions, stated ambition, registry activity and finance needs for Sri Lanka.
STATED NDC TARGET
Conditional NDC and unconditional NDC
Sri Lanka commits to reduce cumulative emissions by 20.09% (8.11% unconditionally and 11.98% conditionally) and to increase net removal of carbon by 4.49% (0.96% unconditionally and 3.53% conditionally) compared to BAU from 2026 to 2035.
Measured progress unavailable · compatible baseline series needed.
CARBON PROJECT TRACKER & INTERACTIVE DESIGN STUDIO · LKA
Explore carbon project records, and design what is possible next in Sri Lanka.
Inspect every voluntary carbon market project listed in Sri Lanka, check methodologies and credit issuances, and build an actionable pipeline of potential carbon projects ready to design in your workspace.
Listed carbon projects
22
10 with recorded issuance
Total Credits Issued
414,283
Registry-reported tCO₂e
Total Credits Retired
216,963
52% retirement ratio
Potential Projects Pipeline
4 projects
100,022 tCO₂e/yr · $1,965,390/yr est.
Loading registered carbon projects for Sri Lanka…
Registry data: Berkeley Carbon Trading Project Voluntary Registry Offsets Database (CC BY 4.0), covering ACR, ART TREES, CAR, Gold Standard, Isometric, and Verra (VCS). Potential project figures are indicative screening estimates for early project design; credit issuance requires site-specific baseline measurements, PDD validation by an accredited VVB/DOE, and registry verification.
03 / FIND A PRACTICAL START
What would you like to work on?
Mannar · Interpretive opportunity
Local-authority organics and waste evidence
Build a waste-flow baseline and prepare a locally operated plan for segregation, composting or other appropriate resource recovery.
NDC Chapter 4, Section 4.2.4 and Table 4.6, printed pp. 29–32, list integrated waste actions and identify local data/infrastructure gaps. NDC identifies local authorities as implementers.
People to involve
Local Authority · Central Environmental Authority · Waste Management Authority where relevant · Waste workers/cooperatives and community groups
First checks
Map collection, disposal responsibilities and existing contracts before selecting technology.
Characterize waste by source and confirm operator, site and end-use arrangements.
What the map can tell you
Locate the proposed study within the 2022-08-16 administrative reference. Compare broad 2021 land-cover classes before a site visit. These layers do not identify the activity, present conditions, rights, hazards or suitability; confirm those with local records and field evidence.
Check on the ground
Waste composition and weight samples
Collection and disposal route records
Site and equipment condition
Worker/community interviews and operating plan
Review your idea after sign-in. An eight-step guide helps you turn it into a private feasibility draft.
No dMRV project type matches this opportunity yet: choose one. You will pick the project type, and Mannar still pre-fills the form.
COUNTRY WORKSPACE
Continue with your next step
Carry the national context for Sri Lanka into public funding, project and research records.
Selected region: Mannar, Sri Lanka. Public results below are national; they are not filtered to this district or region.
Before you start
Do I need a complete project?
No. Start with an activity and a place. You can mark any answer unknown; the guide turns that gap into a practical task.
Does a map selection establish suitability?
No. Use the map to frame local questions. Check the site, rights, participants, technology and evidence with the relevant people.
Can Nemo help with my idea?
Your private project guide works without an AI provider. After sign-in, choose Discuss with Nemo for a question about your project when the service is available.
Sources & context
Country research sources
Explore the original documents and source tables. These references do not establish complete country coverage and do not add values to the map.
Pack 2026-10-29.1. Policy priorities and proposed opportunities are separate from evidence for your project.
Nationally Determined Contributions 3.0 (2026–2035): Sri Lanka
Ministry of Environment, Sri Lanka; published by Climate Change Secretariat · NDC 3.0; publication 2025-09-22; UNFCCC submission 2025-09-25
2026–2035
Ministry of Environment, Sri Lanka; published by Climate Change Secretariat. Nationally Determined Contributions 3.0 (2026–2035): Sri Lanka. NDC 3.0; publication 2025-09-22; UNFCCC submission 2025-09-25.
Reference link only. No source document or figure is redistributed. Explanations are original paraphrases.
UN OCHA / Humanitarian Data Exchange · Source reference valid 2022-08-16; retrieved 2026-10-29
Source reference 2022-08-16; source dataset dates [2022-08-16T00:00:00 TO 2025-10-30T23:59:59]. Administrative changes after that reference may be absent.
Boundaries: Survey Department of Sri Lanka (http://www.survey.gov.lk). Published by UN OCHA / HDX COD-AB. CC BY-IGO 3.0. Generalized by nemoearth; source P-codes retained. No endorsement implied.
Creative Commons Attribution for Intergovernmental Organisations (CC BY-IGO 3.0); https://creativecommons.org/licenses/by/3.0/igo/